Oil Rig – Access stairs and bridging structure

Makaw Scaffolding was entrusted with the design and provision of temporary access to this oil rig while it was moored within a local shipyard. Makaw Scaffoldings team had designed this structure to be constructed off site and ensure that it was craned into position within a few minutes from the rig docking into port in order to ensure that it will be operational for the crew's personnel within minutes of docking.

category

Industrial & Power Generation PlantsMaritime / SuperyachtOil & Gas

date

2020-02-04

plot size

0

no of employees

4

Project Services

Services used in this project listed below

Staircase Towers
Staircase Towers