Maritime / Superyacht
Makaw Scaffolding was entrusted with the design and installation of a fully certified scaffolding structure, consuming in excess of over 200 tons of Layher allround scaffolding equipment. This comprehensive system was augmented by an overlying temporary roofing structure, meticulously engineered to encapsulate this magnificent megayacht using thermoplastic shrink wrap in preparation for a full spray job. Our specialized team at Makaw Scaffolding orchestrated an efficient process, from the initial design phase to the seamless delivery and execution of the project. The result was a fully certified and weatherproof scaffolding structure, providing safe access around all sides of the vessel and achieving a remarkable completion time of just 21 working days from project commencement. Makaw Scaffolding's commitment to excellence and expertise ensured the successful and timely execution of this project, underscoring our ability to deliver reliable and complex scaffolding solutions for the superyacht/maritime industry.
Read MoreMaritime / Superyacht
Makaw Scaffolding was entrusted with the full scaffold access and encapsulation of a 76-meter superyacht to facilitate its comprehensive spray job. Using Layher allround scaffolding equipment, we designed and constructed a robust scaffold structure, which was then roofed with our temporary roofing system, boasting an impressive 18-meter freestanding span, all enclosed under 1,400m2 of durable tarpaulin sheeting. Additionally, our solution provided safe access for third parties to work around the full vessel perimeter. Various access staircase points were strategically incorporated to accommodate tradesmen and crew alike operating on the vessel. The scaffolding package for this project was efficiently completed within 18 working days by our specialized scaffolding team located at a local shipyard in Malta.
Read MoreMaritime / Superyacht
Makaw Scaffolding was entrusted with the scaffolding construction and encapsulation to provide safe access and containment using thermoplastic shrink wrap for a partial spray job on this 82m superyacht. The scaffolding structure set up using Layher allround equipment was full set up in just 15 days from commencement.
Read MoreMaritime / Superyacht
Makaw Scaffolding installed and provided the scaffolding structure enclosing this 34m yacht, facilitating secure access and encapsulation essential for a comprehensive vessel spray job."
Read MoreMaritime / Superyacht
Makaw Scaffolding was entrusted with the scaffold set up and encapsulation of this 45m superyacht using Layher allround scaffold equipment along with a freestanding temporary roof structure constructed out of scaffold lattice girders all of which were shrink wrapped to provide full weather protection and containment for a full vessel spray job.
Read MoreMaritime / Superyacht
The scaffolding structure around this magnificent 98m vessel was fully complete in just 14 working days by Makaw Scaffolding's team to ensure third party spraying contractors complete the vessel refurbishment in time for the summer months. This vessel was partly roofed over the FWD section of the vessel using a temporary lattice beam roof structure along with a partial tube and fitting structure around the remaining areas of the vessel in order to solely cover the areas concerning spraying works on the vessel and to minimize any additional downtimes required for the works to be carried out.
Read MoreMaritime / Superyacht
Makaw Scaffolding was entrusted with the design, construction, and certification of a full scaffold encapsulation, complete with a free-standing gable-pitched temporary roofing structure and enclosed using tarpaulin sheeting, to provide containment and safe access around an 82-meter superyacht for planned refurbishment works over the winter months. The scaffolding scope for this project involved the use of over 120 tons of Layher Scaffolding equipment and 1,400m2 of temporary roof with a clear span of 16 meters, All installed to the highest industry standards and completed within the agreed time frames by our in-house team of scaffolders.
Read MoreMaritime / Superyacht
Makaw scaffolding was entrusted with the design and installation of a hanging scaffolding structure over this 60m superyacht in order to provide safe access for paint refurbishment works around the AFT section of this vessel while it was moored in port. Careful design in the scaffolding structure by our in house engineering team was taken into account in order to ensure equal weight distribution of the scaffolding structure over the vessel. The structure was also eventually fully encapsulated using thermoplastic shrinkwrap in order to ensure proper containment from weather and finishes inside the vessel.
Read MoreMaritime / Superyacht
Makaw Scaffolding was approached with the enquiry for the scaffold encapsulation for this 60m vessel and exceptionally delivered to the client in just a few weeks from enquiry. Our in house team was responsible in the design of the structure, Supply/rental of all scaffolding equipment ,Installation and certification of the full structure which consumed in excess of 90 tons of Layher scaffolding equipment. A temporary roof structure with all necessary preparation work for eventual thermoplastic shrink wrap was designed using standard scaffold lattice beams which were prefabricated off site and craned into position on site minimising any installation downtimes.
Read MoreMaritime / Superyacht
A full scaffold encapsulation was designed, installed and fully certified by Makaw Scaffolding in order to provide weather containment and safe access around all areas of vessel in order for a full spray job to take place. A temporary roof structure for this vessel was prefabricated offsite and installed over the existing scaffolding structure in order for the structure to be full covered using thermoplastic shrinkwrap for weather containment
Read More